Huskur Road | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| General information | |||||||||||
| Other names | Veerasandra | ||||||||||
| Location | Veer Sandra, Electronic City, Bengaluru, Karnataka 560100 | ||||||||||
| Coordinates | 12°50′20″N 77°40′39″E / 12.83901°N 77.67754°E | ||||||||||
| Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | ||||||||||
| Operated by | Namma Metro | ||||||||||
| Line(s) | Yellow Line | ||||||||||
| Platforms | Side platform Platform-1 → Central Silk Board / Rashtreeya Vidyalaya Road Platform-2 → Bommasandra Platform numbers (TBC) | ||||||||||
| Tracks | 2 (TBC) | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated, Double track | ||||||||||
| Platform levels | (TBC) | ||||||||||
| Parking | (TBC) | ||||||||||
| Accessible | (TBC) | ||||||||||
| Other information | |||||||||||
| Status | Under Construction | ||||||||||
| Station code | (TBC) | ||||||||||
| History | |||||||||||
| Opening | April 2024 (TBC) | ||||||||||
| Electrified | 750 V DC third rail (TBC) | ||||||||||
| Services | |||||||||||
| |||||||||||
| Location | |||||||||||
Huskur Road (also known as Veerasandra) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. Around this metro station holds the M5 E-City Shopping Complex, D-Mart E-City, E-City Toll Gate towards Attibele and Veerasandra Lake in South Bengaluru. This metro station is stated to be operational around April 2024. [1][2][3]
Station layout
Station Layout (TBC)
Huskur Road track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 2 Southbound |
Towards → Bommasandra next station is Hebbagodi | |
| Platform 1 Northbound |
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road next station is Electronic City | |
| Side platform | Doors will open on the left | ||
| L2 | ||
Entry/Exits
See also
References
- ↑ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
- ↑ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
- ↑ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
External links
Wikimedia Commons has media related to Namma Metro.
Wikivoyage has a travel guide for Bangalore.
- Bangalore Metro Rail Corporation Ltd. (Official site)
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.
